Acoustic louvre
Contents |
[edit] Introduction
Heat build-up in building services plant is a serious concern when it comes to design. So much so that it is essential to consider it in relation to many factors, including soundproofing. A louvre can help to ease these problems, as well as providing air flow which allows for an enhanced soundproofing solution.
Acoustic louvres can be used in circumstances where air flow is required, but the potential noise breakout from a conventional opening, or louvred opening would be unacceptable.
[edit] Small applications
Size and design can sometimes affect the ability to have a full louvre compound in a space. In this case, a smaller application can be installed to create the same effect on a much smaller level. A screen is just as beneficial for relieving heat build up as well as reducing noise as a full compound is.
The benefits of a small louvre application include:
- Noise reduction.
- Optimal airflow design.
- They can be made into small screens to fit any size room or plant deck.
- They can be designed to any size.
[edit] Louvre compound
A full compound helps to more efficiently block sound and prevents a build-up of heat, as airflow is able to fully surround the plant in the room.
The benefits of a full compound include:
- Full surround airflow prevents a build-up of heat.
- A significant reduction in noise levels.
[edit] Louvre details
Enclosures are made up of acoustic panels as well as supporting steelwork. The panels are made up of sheet steel which is then galvanised, as well as filled with wool for extra sound insulation. There are a number of finishes available for any size louvre. Mitred corners can be included in the design for specialist circumstances.
--Airmatic Ltd 08:58, 20 Oct 2017 (BST)
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.